Machine and industrial cleaning in Bremen: maintenance, not building care

Cleaning of production equipment during shutdown – planned into the window, not into the running shift.

In short

On a production machine, cleaning is not a cosmetic matter. Deposits on guideways, spindles and tool changers affect dimensional accuracy, contaminated metalworking fluids put strain on employees and cooling performance, and grease or dust layers in extraction systems are a safety-relevant condition. Anyone commissioning this work is buying availability – and needs it in the window in which the machine stands.

The buyer's problem

The bottleneck is not cost but availability during shutdown. A machine can only be cleaned while it is standing; during a running shift that is possible at most in isolated spots. The real windows are planned shutdowns, maintenance weekends and plant holidays – and they are claimed by several trades at once: maintenance, electrics, inspections, external contractors. A window awarded at short notice means, in practice, less cleaning time, less dismantling and more compromise.

What shapes the cleaning concept

The scope of work on a system does not follow the size of the machine, but these factors:

  • Type of contamination: swarf, oil and grease, metalworking fluid sludge or dust require different methods.
  • Material and sensitivity: aluminium, anodised layers, paints, seals and control components tolerate different amounts of moisture and chemistry.
  • Assemblies that can be dismantled – and who may open them: the manufacturer, your maintenance team or us.
  • Manufacturer requirements, especially where service or maintenance contracts exist.
  • Available shutdown window with start and end time, and the clearance and lock-off process.
  • Desired post-treatment: degreased guideways and spindles then need lubrication and corrosion protection.
  • Disposal concept for used emulsion and sludge.

Legal and technical classification

On a production system, occupational health and safety law, water law and manufacturer requirements meet. The assignment decides who has to prepare what.

Statutory duty: operator responsibility and occupational safety
The operator must assess hazards and derive the necessary measures. These include shutdown, securing against re-energisation, checking for residual energy and clearance. These tasks cannot be transferred to a service provider; we work within the state you have cleared.
Product directive, not a cleaning instruction: ATEX
The ATEX product directive concerns the placing on the market of explosion-protected equipment, not cleaning. The duty to assess hazards and to draw up an explosion protection document follows from occupational health and safety law. For practical execution that means: no sparking, no whirling up of large quantities of dust, earthing and suitable equipment.
Statutory duty: handling substances hazardous to water
Metalworking fluid emulsions and oily residues are hazardous to water. They must not reach the drainage system. How the used emulsion and the resulting sludge are disposed of, and how that disposal is evidenced, is defined in our quotation for the specific property.
Manufacturer requirement, not a law
Cleaning agents and methods that the machine manufacturer rules out are not used by us. Where service or maintenance contracts exist, we clarify the boundaries before work begins – this requirement takes effect through the contract, not through a regulation.
Boundary: cleaning is not servicing
Servicing, repair and the testing of safety devices are maintenance activities carried out by specialist firms or by the manufacturer. We clean. This boundary belongs in the contract, so that responsibility does not disappear between the parties involved.
No certification by the service provider
We document the work carried out. We are not a certification body and do not certify the conformity of a system. Testing of safety devices does not replace our service, and our service does not replace testing.

The rules named here describe requirements on how the work is carried out — they are not a certification held by BREREI. VDI and DIN standards are chargeable and were not available in full text; where a statement touches the standard in detail, this is noted in place.

What we need for a quotation

For a machine or a group of machines we collect the following details. After a site visit, ideally during a shutdown, the scope of work per machine can be determined.

  • Machine and system list with materials and sensitivities
  • Type and extent of contamination: swarf, oil, metalworking fluid sludge, dust
  • Details of assemblies that can and cannot be dismantled
  • Available shutdown window with start and end time
  • Clearance and lock-off process: who shuts down, secures, clears and accepts
  • Manufacturer requirements
  • Desired post-treatment
  • Disposal concept for used emulsion and sludge

Frequent questions from this industry

Answered briefly, so you can judge whether we fit your property.

Do you also clean during running operation?

On the machine itself, cleaning is only sensible and safe during shutdown – there we work in the cleared window. That does not apply to the surroundings: traffic routes, pits and hall floors can be worked on section by section in agreement with your shift management. Which sections are free and when is something we clarify in advance with your production planning.

What happens to the old metalworking fluid emulsion?

Proper tank cleaning involves more than suction: removing fine sludge, cleaning the pipe network and swarf conveyor, rinsing before refilling and handing over the used emulsion in an orderly way. Handling substances hazardous to water is regulated under water law; the disposal route and the form of evidence are defined in our quotation, so that the process remains traceable for you.

Can sensitive controls and control cabinets be cleaned?

Moisture is the most common cause of damage: water in control cabinets, terminal boxes and bearings leads to corrosion and failures that only appear weeks later. Where wetness is unwanted, dry methods are the better choice, because they introduce no moisture and leave no blasting agent residues. Whether and to what extent that fits the individual case depends on the manufacturer requirements; we clarify that for the specific property.

How much notice do you need to cover a shutdown?

We cannot promise that. The windows are in demand, and a binding commitment requires available capacity. We recommend planning plant holidays and maintenance weekends several weeks in advance. A window awarded at short notice means in practice less time for dismantling and post-treatment – and therefore a poorer result at exactly the points where precision matters.

Who shuts the machines down and clears them?

That stays with your business. Shutdown, securing against re-energisation and clearance are operator tasks and cannot be transferred to a service provider. This preparation is the part that most often causes delay, because it involves several trades. Before commissioning it must therefore be clear who shuts down, who secures, who clears and who accepts the work.

Do you also take on maintenance work on the system?

No. We clean. Servicing, repair and the testing of safety devices are maintenance activities carried out by specialist firms or by the manufacturer. This separation is not a formality: a cleaner without machine knowledge will not make the right decision on a control system. That is why this work belongs to maintenance – with the same formalities as there.

Discuss your shutdown window

We look at the system and the window and describe the scope of work per assembly.

Prefer to talk?

0421 87757597

Mon–Fri, 07:30–17:30 – we are happy to call you back.

Request a quote in two minutes

Service, property and contact details – that is all we need.

Or use the full contact form